Warning: file_exists() [function.file-exists]: open_basedir restriction in effect. File(/home/san/public_html/gallery/head/Maps_of_India_headtags.htm) is not within the allowed path(s): (/home/tarena:/usr/lib/php:/usr/php4/lib/php:/usr/local/lib/php:/usr/local/php4/lib/php:/tmp) in /home/tarena/public_html/gallery/pp-inc.php on line 683 TechArena Photo Gallery - Mumbai Metro Rail Project
Registered: January 2005 Location: bombay Posts: 305
a. Bandra on the WR line to Kurla on the CR line. (7.3 Km)
b. Andheri on the WR line to Ghatkopar on the CR line. (8.3 Km)
c. Andheri on the WR line to Charkop (9.8)